ABSTRACT This paper addresses the main characteristics of the AKPO FPSO. Although the FPSO is similar to other existing ones in terms of size, it is unique. Storage and Offloading unit (FPSO) of the AKPO field development, offshore Nigeria. The AKPO field is located on the Oil Mining License. (OML) offshore . The Akpo FPSO hull will have a storage capacity of two million barrels of oil and a large deck space to accommodate more than 17 topsides modules. Akpo’s.

Author: Arashit Yozshukinos
Country: Japan
Language: English (Spanish)
Genre: Technology
Published (Last): 3 May 2017
Pages: 338
PDF File Size: 16.28 Mb
ePub File Size: 1.76 Mb
ISBN: 275-4-37984-463-8
Downloads: 78954
Price: Free* [*Free Regsitration Required]
Uploader: Malazuru

This Rivers State location article is a stub. Log in to your dpso Username. The six RB gensets are capable of providing the MW of electrical power needed to operate the subsea components of the field. Technip was the project manager and was also responsible for the initial engineering phase.

Proceedings of an international conference Subsea Controls and Data Acquisition ‘ Coordinates on Wikidata All articles with dead external links Articles with dead external links from October Articles with permanently dead external links All stub articles.

Akpo fields Discovered inthe Akpo field is located in ultra deepwater of Nigeria. Construction The vessel is fspo long, 61m wide and has facilities to accommodate crew members. The reservoir fluid is a critical fluid, which implies that the fluid type is dependent on pressure, temperature and depth.

The subsea set up includes 22 oil and gas production wells, 20 water injection wells and two gas injection wells.

Technip Awarded Wins FPSO Contract for Akpo Field in Nigeria

Some of the engineering tasks fabrication of components was carried out when the vessel reached Nigeria. Sources [ edit ] http: You can help Wikipedia by expanding it.

Although the FPSO is similar to other existing ones in terms of size, it is unique, in some particular technical details and principals which have been incorporated in the design, such as: This page was last edited on 6 Octoberat Authors Tchigique Bernard Total S. The main automation contractor for the FPSO is Emerson Process Management who provides digital automation architecture to digitally integrate the topside module control systems. Publishers Content Coverage Privacy.

  COMPLICACIONES DE LA ARTROPLASTIA DE CADERA PDF

The Akpo hull has a storage capacity for two million barrels of oil and the deck was designed to accommodate 17 topside modules, which includes two processing trains for the separation of oil and water. Retrieved from ” https: Pressure maintenance in the reservoirs is necessary, with water injection in 4 of the reservoirs and gas injection in one.

This article about an oil field is a stub. The consortium was responsible for engineering, supply, construction, offshore commissioning and procurement of the vessel.

The stabilized condensate is exported via offloading lines and a deep water buoy located fpdo km away from the FPSO.

Total’s Akpo Starts Producing Offshore Nigeria

The contract also includes EPC engineering, procurement, construction, installation and commissioning of the oil loading terminal, the FPSO mooring system and the gas export pipeline from the FPSO to the Amenam platform. The company performed a series of pre-commissioning services on the field’s flowlines and umbilicals.

Rock Mechanics Symposium and 5th U. Peer reviewed only Published between: In addition, Total awarded a contract to Saipem to supply of all the umbilicals, flowlines akpoo risers for akop vessel under a turnkey basis.

From Wikipedia, the free encyclopedia. Proceedings of an international conference Diverless and Deepwater Techology: HHI was responsible for the construction of the hull and also the construction and integration of the topside modules. These were installed to provide electrical power for the FPSO vessel.

AKPO Project — Floating Production & Offloading System (FPSO) – OnePetro

Although the FPSO is similar to other existing ones in terms of size, it is unique, in some particular technical details and principals which have been incorporated in the design, such as:. Proceedings of an International Conference Submersible Technology: The development includes 44 subsea wells 22 production, 20 water injection fpsoo 2 gas injection drilled in clustered subsea architecture.

  EUROTICA SIZZLE PDF

Akpo is a standalone development based on a spread moored Floating Production Storage and Offloading FPSO moored in m water depth with a storage capacity of 2 million barrels of condensate. Field Development Beginning inthe Akpo field development project includes 44 wells — 22 production wells, 20 water injection wells and two gas injection — of which dpso have already been drilled, tied-back to an FPSO.

HHI contracted Nexans to install 1,km of offshore cables for power and instrumentation infrastructure. The topside fabrication and fitting out was completed in December and the vessel began operations at OMLapproximately km south of Port Harcourt,Nigeria in March Advanced search Show search help.

Proceedings of an international conference Oceanology: About us Contact us Help Terms of use. By using this site, you agree to the Terms of Use and Privacy Policy. The Akpo development involves five reservoirs, deposited in a complex channels and lobe arrangement, situated at depth ranging from mSS to mSS.

For the initial production start-up, around half of these wells are required to be online for production and fpsk pressure maintenance purposes. The vessel is m long, 61m wide and has facilities to accommodate crew members.

Akpo – Wikipedia

This article about a natural gas field is a stub. The subsea infrastructure consists of kilometers of a complex Aipo Read Edit View history. Sheriff’s Encyclopedic Dictionary of Applied Geophysics, fourth edition. Because of these particular characteristics, it was possible to start-up the AKPO field in a limited time frame ahead of schedule and without any major problems.